NCDOT's 'Fortify' project will rebuild crumbling roads - WNCN: News, Weather

NCDOT's 'Fortify' project will rebuild crumbling roads

Posted: Updated:
N.C. DOT said a chemical that was used to build the original roads 30 years ago is causing the pavement to deteriorate. N.C. DOT said a chemical that was used to build the original roads 30 years ago is causing the pavement to deteriorate.
RALEIGH, N.C. -

Right now the 30-year-old pavement on the south side of the beltline is cracking and crumbling.

That's why the North Carolina DOT started its massive "Fortify" project that's going to rebuild the 11.5-mile stretch of 40 and 440.

"This is a safety concern. What we've got is a chemical reaction happening underneath the pavement," explained N.C. DOT's Communication's Director Mike Charbonneau.

Charbonneau said a chemical that was used to build the original roads 30 years ago is causing the pavement to deteriorate.

"We've gotten to the point that, for safety's sake, we have to get in and tear out that entire 11.5-mile stretch of road and rebuild the whole road so that it remains safe for drivers."

Last week, crews extracted core samples to figure out how far down the pavement goes and how deep they'll have to drill.

The massive project will take 3 years to complete. At the DOT's operations center, Charbonneau explained the DOT is bringing more personnel to monitor the roads during the project.

Expect lane closures Monday through Wednesday starting at nine at night until five in the morning.

RELATED STORIES

Eileen Park

Eileen joined WNCN after years of working as a foreign correspondent. During her time off, she enjoys relaxing with her dogs, reading, and exploring the Triangle. More>>

Powered by WorldNow

1205 Front St., Raleigh
N.C., 27609

Telephone: 919.836.1717
Fax: 919.836.1687
Email: newstips@wncn.com

Can't find something?
Powered by WorldNow
All content © Copyright 2000 - 2014 Media General Communications Holdings, LLC. A Media General Company.